引用本文:龙志,杨 柳,姚文峰.广东电网远景直流落点优化研究[J].电力系统保护与控制,2016,44(10):145-150.
LONG Zhi,YANG Liu,YAO Wenfeng.Guangdong power grid DC placement optimization[J].Power System Protection and Control,2016,44(10):145-150
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 6907次   下载 2893 本文二维码信息
码上扫一扫!
分享到: 微信 更多
广东电网远景直流落点优化研究
龙志1,杨 柳2,姚文峰2
(1.中国南方电网有限责任公司,广东 广州 510623;2.南方电网科学研究院,广东 广州 510080)
摘要:
随着广东电力需求的快速增长和西电东送直流输电规模的进一步扩大,广东电网直流落点日趋密集,导致多回直流相互影响加剧、受端系统电压支撑能力不足、系统稳定性变差等一系列问题,对电网规划和运行均提出新的挑战。为从根本上解决上述一系列安全稳定问题,引入基于CIGRE直流工作组的多馈入直流短路比(MISCR)概念。通过整体性、均衡性、干扰性以及综合性4个指标衡量多直流间相互影响,提出了一种兼顾多直流相互影响、稳定性、经济性影响的综合比较方法,可量化比较各项评价指标,具有操作性强的特点,能够适应多直流集中馈入广东电网的直流落点优化,提高电网稳定性。
关键词:  广东电网  直流落点优化  多直流相互影响  稳定性  经济性  综合性
DOI:10.7667/PSPC151172
分类号:
基金项目:
Guangdong power grid DC placement optimization
LONG Zhi1,YANG Liu2,YAO Wenfeng2
(1. China Southern Power Grid, Guangzhou 510623, China; ;2. Electric Power Research Institute, CSG, Guangzhou 510080, China)
Abstract:
With the further advance of the rapid social and economic development and the power transmission from west to east, Guangdong power grid HVDC is gradually intensive, resulting in a series of problems, such as HVDC interaction intensified, end system voltage supporting ability is insufficient, the system stability becomes worse, and putting forward the new challenge to the power system planning and operation. To fundamentally solve a series of safety and stability problems above, this paper introduces the multi infeed MISCR concept based on the CIGRE DC working groups. Through the integrity, balance, interference and comprehensiveness indicators to measure the interaction of multiple HVDC, it presents a comprehensive comparison method considering interaction between multiple DC stability, economic effect quantitative comparison of evaluation indicators, which has the operational characteristics of the DC optimal placement, can adapt to multi DC concentrated feed in Guangdong power grid, and improve power system stability.
Key words:  Guangdong power grid  DC placement optimization  interaction between multiple DC  stability analysis  economic analysis  comprehensive analysis