This work is supported in part by the Strategic Research and Consulting Project of the Chinese Academy of Engineering (No. 2022-XZ-49), and in part by the Key Program of Marine Economy Development (Six Marine Industries) Special Foundation of Department of Natural Resources of Guangdong Province (No. GDNRC[2021]37).
Renshen Tan, Zhaoxia Jing, Yu Wang, Zhuoli Zhao. An Effective Scheduling Strategy for Offshore Wind Farm Maintenance Optimization Considering Multi-Practical Operation Conditions[J]. Protection and Control of Modern Power Systems,2025,V10(2):133-149.[Renshen Tan, Zhaoxia Jing, Yu Wang, Zhuoli Zhao. An Effective Scheduling Strategy for Offshore Wind Farm Maintenance Optimization Considering Multi-Practical Operation Conditions[J]. Power System Protection and Control,2025,V10(2):133-149]
Copy
