1.输变电装备技术全国重点实验室(重庆大学),重庆 400044;2.国网新疆电力有限公司 电力科学研究院,新疆 乌鲁木齐 830011
国家自然科学基金项目资助(52277079);重庆市出站留(来)渝博士后择优项目资助(2020LY23)
1. State Key Laboratory of Power Transmission Equipment Technology (Chongqing University), Chongqing 400044, China; 2. Electric Power Research Institute of State Grid Xinjiang Electric Power Co., Ltd., Urumqi 830011, China
王 建,熊张忞,南东亮,等.灾害天气下计及一二次设备耦合故障的电网短时风险评估[J].电力系统保护与控制,2024,52(9):16-26.[WANG Jian, XIONG Zhangmin, NAN Dongliang, et al. Short-time risk assessment of a power grid in weather disasters considering the coupled faults of primary and secondary equipment[J]. Power System Protection and Control,2024,V52(9):16-26]
复制
