1.南昌大学信息工程学院,江西 南昌 330006;2.国网江西省电力有限公司南昌供电分公司,江西 南昌 330031; 3.南昌大学软件学院,江西 南昌 330006;4.国网江西省电力有限公司经济技术研究院,江西 南昌 330096
国家自然科学基金项目资助(61862042)
1. School of Information Engineering, Nanchang University, Nanchang 330006, China; 2. Nanchang Power Supply Branch, State Grid Jiangxi Electric Power Co., Ltd., Nanchang 330031, China; 3. School of Software, Nanchang University, Nanchang 330006, China; 4. State Grid Jiangxi Electric Power Co., Ltd. Economic and Technical Research Institute, Nanchang 330096, China
杨胡萍,李晓馨,曹正东,等.考虑风光的两阶段配电网动态重构方法[J].电力系统保护与控制,2023,51(21):12-21.[YANG Huping, LI Xiaoxin, CAO Zhengdong, et al. A two-stage dynamic reconfiguration method for distribution networks considering wind and solar power[J]. Power System Protection and Control,2023,V51(21):12-21]
复制
