基于多参数规划理论的时间连续节点电价
CSTR:
作者:
作者单位:

(输配电装备及系统安全与新技术国家重点实验室(重庆大学电气工程学院),重庆 400044)

作者简介:

李晨晨(1993—),女,硕士研究生,主要研究方向为电力市场优化与分析; 余 娟(1981—),女,通信作者,博士,教授,主要研究方向为电力与能源优化运行、风险评估、深度学习; 杨知方(1992—),男,博士生导师,研究员,主要研究方向为电力系统运行优化与分析。E-mail: yzf1992@ cqu.edu.cn

通讯作者:

中图分类号:

基金项目:

国家自然科学基金项目资助(U2066209);中央高校基本科研业务费专项资助(2020CDJQY-A025);电力系统国家重点实验室课题资助(SKLD20KZ01)


Time-continuous locational marginal price based on multi-parametric programming theory
Author:
Affiliation:

(State Key Laboratory of Power Transmission Equipment & System Security and New Technology, College of Electrical Engineering, Chongqing University, Chongqing 400044, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    随着新能源渗透率的不断提高,电力市场需要细化定价颗粒度以反映时变的市场供需关系。基于多参数规划理论,提出时间连续节点电价的计算方法。以时间为规划参数构建经济调度模型,并基于多参数规划理论解析推导了节点电价与时间之间的解析表达式,可快速获得节点电价与时间的连续映射关系,为市场提供随时间连续变化的价格信号。基于IEEE30节点和IEEE118节点系统的仿真分析,验证了所提方法的价格信号合理性及计算效率优势。

    Abstract:

    With the increasing penetration of renewable energy, a pricing method with higher granularity is needed to reflect time-varying market supply and demand. Based on multi-parametric programming theory, this paper proposes a time-continuous locational marginal price (time-continuous LMP) calculating method. The proposed method builds the economic dispatching model with time as the planning parameter, and deduces the analytical expression between LMP and time based on multi-parametric programming theory. In this way the continuous mapping relationship between LMP and time can be obtained directly. This can provide the market with time-continuous price signals. Simulation results based on IEEE30-bus and IEEE118-bus systems demonstrate the reasonableness and effectiveness of the proposed method. This work is supported by the National Natural Science Foundation of China (No. U2066209) and the Fundamental Research Funds for the Central Universities (No. 2020CDJQY-A025).

    参考文献
    相似文献
    引证文献
引用本文

李晨晨,余 娟,杨知方,等.基于多参数规划理论的时间连续节点电价[J].电力系统保护与控制,2021,49(24):105-113.[LI Chenchen, YU Juan, YANG Zhifang, et al. Time-continuous locational marginal price based on multi-parametric programming theory[J]. Power System Protection and Control,2021,V49(24):105-113]