应对大功率缺失的分-省协调实时调度模型
CSTR:
作者:
作者单位:

(1.国家电力调度控制中心,北京100031; 2.国网洛阳供电公司,河南 洛阳 471000; 3.哈尔滨工业大学电气工程及自动化学院,黑龙江 哈尔滨 150001)

作者简介:

罗治强(1977—),男,硕士,高级工程师,研究方向为大电网安全经济运行;
杨军峰(1970—),男,高级工程师,主要研究方向为电网经济运行、电力市场、智能电网;
王其祥(1994—),男,通信作者,硕士,研究方向为电力系统分析与控制。E-mail:wang_qx1204@163.com

通讯作者:

中图分类号:

基金项目:

国家电网公司科技项目(5442dz180019)“全局计划决策与现货市场核心技术研究与应用”


Region-province coordinated real-time dispatch model considering large-scale power loss
Author:
Affiliation:

(1. National Electric Power Dispatching and Control Center, Beijing 100031, China;2. State Grid Luoyang Power Supply Company, Luoyang 471000, China;3. School of Electrical Engineering & Automation, Harbin Institute of Technology, Harbin 150001, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对大功率交直流联络线故障将导致受端电网大规模功率缺失,而省域电网内部分机组由省级电网调度,另一部分由区域分中心调度等问题,研究分-省两级电网调度中心实时发电计划协调调整策略。首先建立了省调机组/直调机组有功调整量分配模型和出力跟踪校验模型。针对省调机组/直调机组可能无法完全跟踪分配到的有功调整量的情况,进一步提出了省调机组/直调机组有功协调策略及出力校正模型,形成了一套适用于省域电网大功率缺失场景的省调机组/直调机组实时发电计划协调编制方法。仿真结果表明,与常规实时调度方法相比,该方法有助于快速恢复省域电网大功率缺失后的有功平衡。

    Abstract:

    Failure of high-power AC/DC tie-line will lead to large-scale power loss in the receiving-end power grid, and a part of the provincial units are dispatched by the provincial power grid (P-Units), the other part is dispatched by the regional grid (R-Units). In view of the above problems, the coordinated adjustment strategy of real-time generation plan for regional and provincial dispatching units is studied. Firstly, the models for the allocation of active power adjustment and output tracking between P-Units and R-Units are constructed. For the cases that P-Units or R-Units might not be able to track the allocated active power adjustment, a coordination strategy for active power of P-Units and R-Units is proposed, followed by an output correction model. Together, a set of real-time scheduling methods coordinated P-Units and R-Units which are suitable for provincial power grid under large power loss are formed. Simulation result shows that compared with conventional real-time scheduling method, the proposed method is conducive to fast recovery of provincial grid active power balance after large-scale power loss. This work is supported by Science & Technology Project of State Grid Corporation of China (No. 5442dz180019) “Research and Application of Core Technology in Global Planning Decision and Spot Market” .

    参考文献
    相似文献
    引证文献
引用本文

罗治强,杨军峰,王其祥,等.应对大功率缺失的分-省协调实时调度模型[J].电力系统保护与控制,2019,47(12):132-137.[LUO Zhiqiang, YANG Junfeng, WANG Qixiang, et al. Region-province coordinated real-time dispatch model considering large-scale power loss[J]. Power System Protection and Control,2019,V47(12):132-137]

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2018-07-07
  • 最后修改日期:2018-10-01
  • 录用日期:
  • 在线发布日期: 2019-06-15
  • 出版日期:
文章二维码
关闭
关闭