面向新型电力系统的输电网与分布式变速抽水蓄能联合规划
徐秋实1,施通勤1,井浩然2,姚 伟2,莫 石1,赵红生1,文劲宇2
1.国网湖北省电力有限公司经济技术研究院,湖北 武汉 430077;2.华中科技大学电气与电子工程学院 强电磁工程与新技术国家重点实验室,湖北 武汉 430074
摘要:
针对高比例新能源场景下分布式变速抽水蓄能的容量配置及其在电网中的位置接入问题,提出了输电网和分布式变速抽水蓄能的联合规划方案。首先,考虑了各类抽水蓄能的运行和库容约束、火电机组的出力和爬坡约束以及输电网的传输能力,以分布式新能源的经济消纳为优化目标,建立了分布式变速抽水蓄能和输电网间的联合规划模型。然后,通过凸松弛方法将该模型转化为混合整数线性规划模型,以两阶段优化方法求解得到了分布式变速抽水蓄能与输电网的联合规划方案。最后,采用两个标准测试系统对比验证了所提含分布式变速抽水蓄能的联合规划相较于定速抽水蓄能的规划方案,能更好地与其他灵活性资源相协调以消纳风光可再生能源,总体上可降低约20%的成本。
关键词:  高比例新能源  变速抽水蓄能  输电网  联合规划
DOI:10.19783/j.cnki.pspc.231044
分类号:
基金项目:国家电网公司总部科技项目资助(5100-20222010A- 1-1-ZN)
Joint planning of a transmission network and distributed variable speed pumpedstorage for a new power system
XU Qiushi1, SHI Tongqin1, JING Haoran2, YAO Wei2, MO Shi1, ZHAO Hongsheng1, WEN Jinyu2
1. Economic and Technological Research Institute of State Grid Hubei Electric Power Co., Ltd., Wuhan 430077, China; 2. State Key Laboratory of Advanced Electromagnetic Engineering and Technology, School of Electrical and Electronic Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
Abstract:
To address the capacity allocation of distributed variable-speed pumped storage and its positional access in the network when there is a high proportion of renewable energy, a joint planning scheme for the transmission network and distributed variable-speed pumped storage is proposed. First, the operation and reservoir constraints of various types of pumped storage, the output and ramp constraints of thermal power units, and the transmission capacity of the transmission networks are taken into account, and a joint planning model between distributed variable-speed pumped storage and the transmission network is established with the optimization objective of economic consumption of distributed renewable energy. Then, the model is transformed into a mixed-integer linear programming model by a convex relaxation method, and the joint planning scheme for distributed variable-speed pumped storage and the transmission network is obtained by using a two-stage optimization method. Finally, two standard test systems are adopted for comparison and validation. Compared to a fixed-speed pumped storage scheme, the proposed joint planning with distributed variable-speed pumped storage can effectively coordinate with other flexible resources to accommodate renewable energy sources, leading to approximately 20% overall cost reduction.
Key words:  high-penetrated renewable energy  variable speed pumped storage  transmission network  joint planning
  • 1
X关闭
  • 1
X关闭
引用本文:
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览次   下载  
分享到: 微信 更多
摘要:
关键词:  
DOI:
分类号:
基金项目:
Abstract:
Key words:  
  • 1
X关闭
  • 1
X关闭