智能变电站过程层冗余组网模式及网络延时累加技术研究
陶文伟1,高红亮1,杨 贵2,张喜铭1,彭 安2
(1.中国南方电网电力调度控制中心,广东 广州 510663;2.南京南瑞继保电气有限公司,江苏 南京 211100)
摘要:
当前智能变电站过程层采用双网架构,IED设备的处理器同时处理双网数据,存在处理器负荷高的问题。SV采用光纤直连传输方式、存在布线复杂、IED设备光口多、成本高、装置发热量大、信息共享困难及链路无法监视等各种问题。同时GOOSE采用网络传输方式,过程层网络与光纤直连方式并存,结构不清晰问题。针对高可靠性无缝冗余协议(High Reliablity Seamless Redundant Protocol, HSR)和并行冗余协议(Parallel Redundant Protocol, PRP)的智能变电站过程层组网进行了研究,并基于该组网基础上进行了HSR和PRP的延时累加技术研究及测试。该研究为将来在国内智能变电站进行推广应用此技术提供了坚实的理论分析和测试结果参考数据。
关键词:  智能变电站  延时累加  HSR  PRP  过程层
DOI:10.7667/PSPC170592
分类号:
基金项目:中国南方电网公司重点科技项目(ZDKJQQ00000016)
Research on redundant networking mode and network delay accumulationtechnology of smart substation process layer
TAO Wenwei1,GAO Hongliang1,YANG Gui2,ZHANG Ximing1,PENG An2
(1. Power Dispatching and Control Center of China Southern Power Grid, Guangzhou 510663, China;2. NR Electric Co., Ltd, Nanjing 211100, China)
Abstract:
The current smart substation process layer adopts dual-network architecture and IED processor processes dual-network data simultaneously, which causes the problem of high processor load. SV uses the mode of directly connected through optical fiber transmission, in which exists complex wiring, multi port of IED equipment, high cost, high heating of equipment, difficulties in information sharing, and the issues that links can not be monitored, etc. At the same time, GOOSE adopts network transmission mode, the process layer network and optical fiber connection mode coexist, so the structure is not clear. The process network of smart substation of HSR (High Reliablity Seamless Redundant Protocol) and PRP (Parallel Redundant Protocol) is studied, and the delay accumulation technology of HSR and PRP is studied and tested on the basis of the network. It provides a solid theoretical analysis and test result reference data for the future popularization and application of smart substation in China. This work is supported by Science and Technology Project of China Southern Power Grid (No. ZDKJQQ00000016).
Key words:  smart substation  delay accumulation  HSR  PRP  process layer
  • 1
X关闭
  • 1
X关闭
引用本文:
【打印本页】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览次   下载  
分享到: 微信 更多
摘要:
关键词:  
DOI:
分类号:
基金项目:
Abstract:
Key words:  
  • 1
X关闭
  • 1
X关闭